The Project

The team

Wooten|Sundt, a joint venture of Sundt Construction, Inc. and Wooten Construction, has begun construction on the first phase of additions and renovations at the 60-year-old Las Cruces High School campus.

The $36 million project, led from Wooten|Sundt’s Las Cruces office, includes several new parking lots and athletic fields, as well as 156,000 square feet of structural additions anchored by a two-story classroom building, administration areas, a media center, a performing arts laboratory and a pedestrian bridge built over one of the busiest streets in Las Cruces.

Working closely with architect Alley Associates, PC, Wooten|Sundt plans to have the first phase of construction completed by August 2015. The new campus additions will help improve student flow between classes and provide a safer environment for the one of the state’s most populated high schools.


 

Construction team

Wooten | Sundt

575.526.5581

PO Box 1839 Las Cruces NM 88004

Design Team

Alley Associates, PC

575.523.1310

1691 Hickory Loop # A Las Cruces, NM 88005

The District

LAS Cruces High School

 575.527.9400

505 S Main Street, Suite 249 Las Cruces, NM 88001